Showing 10–13 of 13 results
-
Single Components
Floor panel (set of 2)
The floor panel is inserted into the intermediate floor and enables the addition of another level. Available in transparent or frosted versions for flexible training scenarios.
incl. VAT
plus shipping costs
Delivery time: 10-15 business days
-
Single Components
Staircase
Staircase for the realistic construction of multi-story model buildings. Realistic, functional, and easy to integrate.
incl. VAT
plus shipping costs
Delivery time: 10-15 business days
-
Single Components
Connector pin (pack of 5)
The connector pin serves as a stable element for securely joining pillars with the base plate or intermediate floor. It enables a sturdy and flexible construction of the model house.
incl. VAT
plus shipping costs
Delivery time: 10-15 business days
-
Single Components
Plug (pack of 5)
The plug seals unused inlets in the intermediate floor to prevent uncontrolled smoke escape and ensure realistic smoke distribution.
incl. VAT
plus shipping costs
Delivery time: 10-15 business days
Showing 10–13 of 13 results
